Hi Melanie,

They won’t be going through or under the creek. I’m told they will dig the hole just outside the wooden gate at 412, and feed the cable to the transformer that way. They’re pulling the power from the above ground line across the street. They also said they're not going to touch any of the stamped concrete/parking pads. 

Best,
Jordan


--
Jordan Sharon
jsharona at gmail.com
323.680.6177

> On Mar 4, 2026, at 9:06 PM, melanie davenport <meldavenport at gmail.com> wrote:
> 
> Hey there, I wonder if the ga power folks will be tearing up the parking pads in front of 410/412? Also wondering about our fence at 412 between transformer and creek... any indication of what the work will look like on that side?
> 
> 
> Thanks much~
> Mel
> 
> Melanie G. Davenport, PhD
> Art Teacher
> Laurel Ridge Elementary School
> 
> On Tue, Mar 3, 2026, 8:04 PM David Weiner via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>> Jordan,
>> 
>> Thanks for handling this while I was at my doctors appointment.
>> 
>> Dave
>> 
>>> On Mar 3, 2026, at 15:20, Jordan Sharon via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>> 
>>> Hi All,
>>> 
>>> Georgia Power was here yesterday to go over the plans to replace our main power line. As of now I’m told they want to start as early as tomorrow or Thursday. They are just waiting to receive the locations of the remaining utility lines that run underneath our driveway. They anticipate the work to take 1 to 1.5 weeks to complete, and they will be working on site between 8am and 4pm. 
>>> 
>>> Here is what to expect:
>>> 
>>> They will have a 3-4 man crew that will be boring below our driveway to feed the new power lines through to our transformers. The process requires them to dig four 4ft x 4ft holes - one next each transformer and the fourth near the entrance to our driveway off of Drexel.  I have attached the diagram they shared that shows where the lines will be replaced and the locations of the 3 transformers on our property. They will also dig several 1ft x 1ft pothole sized holes wherever another utility line is located (the spray painted lines on the driveway). These holes will be dug along the side of the driveway as to not block access in or out.  They do not anticipate any loss of power, but if needed they will give us a 72 hour notice. There is a possibility that something unexpected may occur during the process, and the power may go out without notice, but hopefully this won’t happen.  The reps from Georgia Power also confirmed that they are 100% responsible for repairing any damage done to the driveway/landscape.
>>> 
>>> A couple of things to be aware of:
>>> 
>>> At some point the transformer located next to Maryann’s home (344 Drexel) was hit by a vehicle and knocked of it’s concrete platform. They flagged this as a potential issue that may lead to an unexpected outage, but won’t know until they open the transformer and see the condition within. 
>>> 
>>> Also, they made me aware that legally no plant life should be planted within 10ft of each transformer. They will need to trim back the bush next to the transformer by 344 Drexel and will need to remove the bushes in front of the transformer next to Sara’s home (408 Drexel). Unfortunately due to the rules of proximity they cannot replace these plants.
>>> 
>>> I will keep everyone in the loop as the project gets underway, but in the meantime please let me know any questions or concerns.
>>> 
>>> Best,
>>> Jordan
>>> 
>>> 
>>>   
>>> 
>>> <X5317 X5318 CHELSEA PLACE CONDOS.pdf>
>>> 
>>> 
>>> --
>>> Jordan Sharon
>>> jsharona at gmail.com <mailto:jsharona at gmail.com>
>>> 323.680.6177
>>> 
>>>> On Feb 26, 2026, at 3:43 PM, Lauren Rich via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>> 
>>>> Tytyty jordan!
>>>> 
>>>> Lauren Rich
>>>> Atlanta, GA
>>>> 
>>>> 
>>>> On Thu, Feb 26, 2026, 1:24 PM Jordan Sharon via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>>> Hi All,
>>>>> 
>>>>> I just spoke with Mr. Hall, the engineer on this project. He's setting up an on-site meeting/walkthrough with his coordinator and team to go over the plans and address any questions/concerns we have. We're aiming to have this meeting early next week and I’ll follow up with the date and time when I hear from him. 
>>>>> 
>>>>> In the meantime he confirmed they are only replacing the main line that runs underneath the creek, not the individual lines that go to the meters. They will need to dig up a portion of the asphalt driveway near the entrance off the main road, and they are responsible for repairing/restoring any damage done to driveway, landscape, etc. We'll get more details at the meeting. He's also sending me the project plans via email which I will share as well. 
>>>>> 
>>>>> Please let me know any questions.
>>>>> 
>>>>> Jordan
>>>>> 
>>>>> 
>>>>> --
>>>>> Jordan Sharon
>>>>> jsharona at gmail.com <mailto:jsharona at gmail.com>
>>>>> 323.680.6177
>>>>> 
>>>>>> On Feb 26, 2026, at 7:57 AM, Maryann Dabkowski via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>>>> 
>>>>>> Confirming I didn't speak with them; I think they just misunderstood Lauren's role. 
>>>>>> 
>>>>>> 
>>>>>> 
>>>>>> On Wed, Feb 25, 2026 at 9:11 PM David Weiner via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>>>>> I haven't gotten any calls or emails from Georgia Power or the contractor. 
>>>>>>> 
>>>>>>> Dave 
>>>>>>> 
>>>>>>> On Wed, Feb 25, 2026, 20:10 Jordan Sharon via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>>>>>> Thanks Rosamond. I will contact Georgia Power tomorrow. 
>>>>>>>> 
>>>>>>>> 
>>>>>>>> --
>>>>>>>> Jordan Sharon
>>>>>>>> jsharona at gmail.com <mailto:jsharona at gmail.com>
>>>>>>>> 323.680.6177
>>>>>>>> 
>>>>>>>>> On Feb 25, 2026, at 7:06 PM, R.C. Rodman <rcr1026 at gmail.com <mailto:rcr1026 at gmail.com>> wrote:
>>>>>>>>> 
>>>>>>>>> Not sure that what I gathered from a conversation with the Georgia Power guy and the engineer (contractor) today will be of help, but here is what I gleaned from a short conversation with them:
>>>>>>>>> 
>>>>>>>>> They are needing to lay cable for main power lines. The lines that serve us are both old and go over the bridge, which is not okay. 
>>>>>>>>> 
>>>>>>>>> I got the sense that it wasn't a choice thing but a need thing. 
>>>>>>>>> 
>>>>>>>>> He said they'd start in a week or two, and that people would be notified. But he also said that they couldn't notify homeowners unless they are signed up to receive notifications, only the HOA rep because the FCC otherwise considers it soliciting. He mentioned that he had not heard back from Dave, so they may be trying to reach Dave. 
>>>>>>>>> 
>>>>>>>>> This is a Georgia Power job, though they are contracting some of the work out, so it might be best to start with the GP guy who gave Lauren his card (he said he gave it to the HOA secretary, but from Lauren's email maybe that is what he meant, unless Maryann also spoke to him).  I suspect that is where questions will end up anyway
>>>>>>>>> 
>>>>>>>>> They will be digging, and probably will rip up the driveway in a spot or two (specifically right in front of Maryann's place). They will repair it and put it back as close to the original as possible. They said it might take a week. 
>>>>>>>>> 
>>>>>>>>> Rosamond
>>>>>>>>> 
>>>>>>>>> 
>>>>>>>>> On Wed, Feb 25, 2026 at 6:21 PM Jordan Sharon via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>>>>>>>> I’m happy to reach out to the contractor. Feel free to send me their contact information. 
>>>>>>>>>> 
>>>>>>>>>> --
>>>>>>>>>> Jordan Sharon
>>>>>>>>>> jsharona at gmail.com <mailto:jsharona at gmail.com>
>>>>>>>>>> 323.680.6177
>>>>>>>>>> 
>>>>>>>>>>> On Feb 25, 2026, at 5:51 PM, Lauren Rich via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>>>>>>>>> 
>>>>>>>>>>> Will do, I think Ron volunteered, but will forward to jordan
>>>>>>>>>>> 
>>>>>>>>>>> Lauren Rich
>>>>>>>>>>> Atlanta, GA
>>>>>>>>>>> 
>>>>>>>>>>> 
>>>>>>>>>>> On Wed, Feb 25, 2026, 5:44 PM David Weiner via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>>>>>>>>>> But I won't be able to do anything about it until Monday, as I assume I won't be able to reach the contractor over the weekend. Since it sounds like things are moving faster than that, Lauren, would you please pass the contact information on to Jordan? Jordan, will you please reach out to them? I only have email access right now.
>>>>>>>>>>>> 
>>>>>>>>>>>> Dave 
>>>>>>>>>>>> 
>>>>>>>>>>>> On Wed, Feb 25, 2026, 16:37 Lauren Rich via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>>>>>>>>>>> I just saw that dave saw my email. 
>>>>>>>>>>>>> 
>>>>>>>>>>>>> Lauren Rich
>>>>>>>>>>>>> Atlanta, GA
>>>>>>>>>>>>> 
>>>>>>>>>>>>> 
>>>>>>>>>>>>> On Wed, Feb 25, 2026, 4:36 PM Lauren Rich <laureninatlanta at gmail.com <mailto:laureninatlanta at gmail.com>> wrote:
>>>>>>>>>>>>>> Hi ron - 
>>>>>>>>>>>>>> 
>>>>>>>>>>>>>> I shared w dave yesterday by email that a 3rd pty contractor from ga power approached me yesterday as i was leaving, he wanted to speak and meet w our assoc pres as ga power intends to replace our underground lines (they go back to 1984). I m not sure dave is in town, i will give him a call. The contractor told me they want to start next week; worst case is it could take 2 weeks. I do not know what they will have to dig up to do this. I was assured by him that we won't lose power during this time. 
>>>>>>>>>>>>>> 
>>>>>>>>>>>>>> Lauren Rich
>>>>>>>>>>>>>> Atlanta, GA
>>>>>>>>>>>>>> 
>>>>>>>>>>>>>> 
>>>>>>>>>>>>>> On Wed, Feb 25, 2026, 3:03 PM Ronald Baggett via Everyone <everyone at chelseaplacedecatur.com <mailto:everyone at chelseaplacedecatur.com>> wrote:
>>>>>>>>>>>>>>> Hi everyone, saw a guy marking the property and he said GA Power was going to replace the power main supplying our properties.  Does anyone know about this?
>>>>>>>>>>>>>>> He said the work order had the project staring tomorrow but he advised that normally means 5-10 days before they actually show up to do the work. 
>>>>>>>>>>>>>>> Ron
>>>>>>>>>>>>>>> Sent from my iPhone
>>>>>>>>>>>>>>> _______________________________________________
>>>>>>>>>>>>>>> Everyone mailing list
>>>>>>>>>>>>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>>>>>>>>>>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>>>>>>>>>>>> _______________________________________________
>>>>>>>>>>>>> Everyone mailing list
>>>>>>>>>>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>>>>>>>>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>>>>>>>>>>> _______________________________________________
>>>>>>>>>>>> Everyone mailing list
>>>>>>>>>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>>>>>>>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>>>>>>>>>> _______________________________________________
>>>>>>>>>>> Everyone mailing list
>>>>>>>>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>>>>>>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>>>>>>>>> 
>>>>>>>>>> _______________________________________________
>>>>>>>>>> Everyone mailing list
>>>>>>>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>>>>>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>>>>>>> 
>>>>>>>> _______________________________________________
>>>>>>>> Everyone mailing list
>>>>>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>>>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>>>>>> _______________________________________________
>>>>>>> Everyone mailing list
>>>>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>>>>> _______________________________________________
>>>>>> Everyone mailing list
>>>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>>>> 
>>>>> _______________________________________________
>>>>> Everyone mailing list
>>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>>> _______________________________________________
>>>> Everyone mailing list
>>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>>> 
>>> _______________________________________________
>>> Everyone mailing list
>>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone
>> 
>> _______________________________________________
>> Everyone mailing list
>> Everyone at chelseaplacedecatur.com <mailto:Everyone at chelseaplacedecatur.com>
>> https://chelseaplacedecatur.com/cgi-bin/mailman/listinfo/everyone

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://chelseaplacedecatur.com/pipermail/everyone/attachments/20260305/2eb9863d/attachment-0001.htm>


More information about the Everyone mailing list